Preparation of the bottom for anti-osmosis coating
Anti-osmosis preparation: this yard job documents the stripping stage before the barrier coating. The eight days recorded below cover preparation…
This is a December 2023 repair record for a rudder damaged by grounding. Four days and €1,500 describe that job; a new grounding needs its own structural inspection.
Rudder restoration after hitting the rock.
Work done:
Broken rudder was restored, full additional coating.
Time:
4 days
Price:
1500€, December 2023